The team at Bluewater of South Florida, Inc. has experience in all aspects of underground utility and site development construction.
We have further gained recent experience by branching out all over Southwest Florida including the Manatee/Sarasota/Port Charlotte/Bradenton.
We have completed a 9 acre site on MLK Blvd. for Race Trac Petrolum. The station included utitility directional drills, grinder pumps station, sewer main and all site work. A turn lane from State Road 82 (MLK Blvd.) was also completed as part of this project.
Completed while maintaining typical hours of operation for the 5th/3rd Bank. Project also included milling and seal coating existing pavement.
For the new Race Trac on Martin Luther King Blvd. and Ortiz Ave. in Fort Myers, FL.
a.k.a Secoya Reserve. Provided complete site/utility package including roadway and earthwork in Naples, FL.
On existing County irrigation main.
For the Ivy at Naples Grande.
Installed under the existing parking garage at the Mercato Shops in Naples, FL.
For the Toyota of Lakewood Ranch in Bradenton, FL. Bluewater provided a complete utility package including fire line, storm drainage, sanitary sewer, and potable water.
We have completed numerous site and utility packages for many of the new Chase Banks and Culver’s Restuarants in previously developed Planned Unit Developments with the Southwest Florida area.
In addition to the retail shops, many developers have continued to build on outparcels and mid-size commercial sites. Bluewater has provided turn key operations from utility installation through final site paving and grading.